About Us
2009 June. RMKE was established.
2016 November. Train Unloading Station CY I started operating.
2017 December. Port annual loading volume reach 3 million tons.
2019 October. Port loading conveyor belt line 3 started operating.
2020 December. Port annual loading volume reach 5 million tons.
Wisma RMK 2nd Floor
Jalan Puri Kencana Blok M4 No.1
Kembangan, Jakarta Barat, Jakarta 11610