About Us

Committed to Keep Growing

Corporate Milestones

  • 2009

    2009 June. RMKE was established.

  • 2014

    • 2014 March. RMKE’s Port at Keramasan, Palembang started operating.
    • 2014 November. Port annual loading volume reach 1 million tons.

  • 2016

    2016 November. Train Unloading Station CY I started operating.

  • 2017

    2017 December. Port annual loading volume reach 3 million tons.

  • 2018

    • 2018 December. Train Unloading Station CY II started operating.
    • 2018 December. Port annual loading volume reach 4 million tons.

  • 2019

    2019 October. Port loading conveyor belt line 3 started operating.

  • 2020

    2020 December. Port annual loading volume reach 5 million tons.

  • 2021

    • 2021 January. Commenced operations of 3rd unloading facility (CY3A) at Simpang station.
    • 2021 October. Commenced operations Upgraded Line 2 barge loading to have double lanes and stacker conveyor.
    • 2021 December. Held Initial Public Offering.

  • 2022

    • 2022 February. TBBE coal mine began operating and trading.
    • 2022 February. Commenced operation of Gunung Megang Loading Facility which is equipped with a Train Loading System (TLS).
    • 2022 June. Commenced operations of 4th unloading facility (CY3B) at Simpang station.

  • 2023

    • 2023 December. Port annual loading volume reach 7,5 million tons.
    • 2023 December. Simpang Train Unloading Station volume reach 11,1 million tons.

  • 2024

    • 2024 January. Bottom dump Simpang Train Unloading Station completed.